- Area
- 15m²
- Perimeter m
- 16m
- Cut / fill volume
- 4.5m³
- Retaining recommended?
- Yes
- Stepped levels
- 2
Heads-up: Gentle slopes (under 1:20) can be absorbed in the build-up. Steeper than that and you're either excavating into the bank or building up — both have cost implications. Why it matters: Retaining walls over 1 m bring Building Regs into play — see the retaining-wall calc.