Garden Surveyor logoGarden Surveyor

MOT Type 1 Calculator

Tonnes and bulk bags of MOT, compacted vs loose.

Inputs

Clay / soft ground raises the default compacted depth by 50 mm and adds a geotextile membrane.

Restricted or very restricted access switches delivery from bulk bags to 25 kg hand-bagged bags, and drives the barrow / machinery recommendations below.

1 advanced input hidden. Switch to Advanced to fine-tune.

Confidencemedium· 71Complexitylow· 18
t required
3.94t
Bulk bags to order (0.85t)
5
Bulk bags (0.85t)
5

Order what you need for this job

Ad · Some links are sponsored. We may earn a small commission at no extra cost to you. Suppliers are chosen for fit, not commission.

Heads-up: MOT Type 1 is sold loose but laid compacted. The tonnes shown already include the ×1.25 compaction factor — order the figure above, not the surface volume. Why it matters: Bulk bags are typically 0.7–0.85 t, not 1 t. Check your supplier's bag weight before dividing.

Quantities pre-filled from your calculation (15.0 m²). Partner links — we may earn a small commission if you buy, at no cost to you.

Quantities include a ~10% waste allowance. Guide prices are indicative UK ranges (materials only, inc. VAT) — always confirm with the supplier before ordering.

Prefer to hire a pro?

Compare quotes from vetted local trades using this exact spec.

Up to 3 quotes No obligation Free

Ad · Some links are sponsored. We may earn a small commission at no extra cost to you. Suppliers are chosen for fit, not commission.

This app provides general UK guidance and material estimates only. It is not legal, planning, engineering or building-control advice. Always confirm requirements with your local planning authority, building control, utility providers, manufacturers or qualified professionals.