Driveway Calculator
Surface, sub-base and drainage-aware driveway estimator.
15 advanced inputs hidden. Switch to Advanced to fine-tune.
Site context (optional)
Helps tailor algae, weather and longevity advice.
Order what you need for this job

Standard 200×100 mm block paving
Paving & Building Supplies
Need ~17 m²
£18–£35 / m² · ~£306–£595
Check price
Edging / edge restraint
Amazon
Need ~18 linear-m
£6–£14 / linear m · ~£108–£252
See options
Ad · Some links are sponsored. We may earn a small commission at no extra cost to you. Suppliers are chosen for fit, not commission.
- Area
- 15m²
- Perimeter m
- 16m
- Blocks required
- 811
- Coverage (with allowance)
- 16.2m²
- Wastage applied
- 5%
- Cuts allowance
- 3%
- Total allowance
- 8%
- Edge restraint length
- 16m
- Edging units (600 mm)
- 27
- Kiln-dried jointing sand
- 30kg
- Screed (laying) sand
- 1.2t
- Sub Base Depth mm
- 150mm
- MOT Type 1 (theoretical)
- 5.91t
- MOT Type 1 (order qty incl. 10%)
- 6.5t
- MOT bulk bags (order)
- 8
- Bedding Depth mm
- 50mm
- Excavation depth
- 222mm
- Excavation volume
- 3.33m³
- Spoil volume (bulked)
- 4.33m³
- Spoil tonnes
- 5.33t
Heads-up: Block paving lives or dies on its edge restraints — concrete-haunched kerbs or edging blocks on three sides minimum. Laid on a 30 mm sharp-sand bed over compacted MOT Type 1, with kiln-dried sand brushed and vibrated into the joints. Why it matters: For driveways use herringbone (45° or 90°) — it locks under wheel loads. Stretcher bond will rut under cars within a season.
Drainage & falls
Surface drainage is advised here — set a gentle fall away from the house and any structures.
Lay paving with falls of 1:80 (recommended) or 1:60 (minimum) away from buildings.
Why it matters: Smooth paving needs a positive fall to overcome surface tension and shed water before it ponds in low spots.
If ignored: Insufficient falls cause standing water, algae growth, freeze-thaw damage and water tracking back toward the building.
- • Recommended falls: 1:80
- • Edge restraints required
- • Falls 1:80
Quantities pre-filled from your calculation (15.0 m²). Partner links — we may earn a small commission if you buy, at no cost to you.
Essentials for this job

Standard 200×100 mm block paving
Paving & Building Supplies
Need ~17 m² for your job
Pallets of 9.9 m² block paving for driveways and paths.
Check price at Paving & Building SuppliesGuide price: £18–£35 / m²(~£306–£595 total)
Indicative · reviewed May 2026

MOT Type 1 sub-base — bulk bags
Building Materials Nationwide
Need ~7 tonne for your job
Crushed limestone MOT sub-base in 800 kg bulk bags, delivered to kerbside.
Check price at Building Materials NationwideGuide price: £35–£60 / tonne(~£245–£420 total)
Indicative · reviewed May 2026
Quantities include a ~10% waste allowance. Guide prices are indicative UK ranges (materials only, inc. VAT) — always confirm with the supplier before ordering.
Prefer to hire a pro?
Compare quotes from vetted local trades using this exact spec.
Ad · Some links are sponsored. We may earn a small commission at no extra cost to you. Suppliers are chosen for fit, not commission.
This app provides general UK guidance and material estimates only. It is not legal, planning, engineering or building-control advice. Always confirm requirements with your local planning authority, building control, utility providers, manufacturers or qualified professionals.